Construction Estimating by Trade
Pick your trade to see exactly what we quantify, the deliverables you receive and the typical turnaround — from foundations and slabs to brick, block and stone walls.
Structure
3 tradesTrade Estimating FAQs
What contractors ask before ordering a trade takeoff.
What is trade-specific estimating?
Trade-specific estimating measures and prices only the work a single trade is responsible for — for example concrete, lumber framing or plumbing. It gives subcontractors a focused takeoff and cost estimate they can bid from without paying for divisions outside their scope.
How do I know which trade page I need?
Start with the CSI division or scope you bid. If you pour concrete, frame with lumber or run pipe and set fixtures, open that trade page to see exactly what is quantified, the deliverables and turnaround. Each page links to related trades if your scope spans more than one.
How much does a trade takeoff cost?
Pricing depends on project size, drawing complexity and the trade involved. Single-trade takeoffs are quoted as a fixed fee before work begins, and you always approve the price and delivery date upfront.
How fast are trade takeoffs delivered?
Most trade takeoffs are delivered in 3–5 business days depending on the size of the drawing set. Rush turnaround is available when your bid date is tight — share the date and we will confirm the schedule upfront.
How accurate are your trade estimates?
Our trade takeoffs consistently achieve 99%+ accuracy. Quantities are measured directly from your drawings and pass a multi-stage QA review by a senior estimator before delivery.
Not sure which trade you need?
Send us the drawing set and scope — we'll recommend the right trade breakdown and confirm a fixed price and delivery date.
Trusted by 800+ contractors
